Description
The recommendations have been completely restructured in this 10 th (2020) English edition of the EAU. They cover planning, design, tendering, award of contract, construction, site supervision, acceptance and settlement of accounts for port, harbour and waterway facilities.
About the author
The Waterfront Structures Committee has been working on a voluntary basis since 1949 as a committee of the Hamburg-based Hafenbautechnische Gesellschaft e.V. (HTG, German Port Technology Association) and, since 1951, concurrently as Study Group 2.2 of the Essen-based Deutsche Gesellschaft für Geotechnik e.V. (DGGT, German Geotechnical Society). The full title of the committee translates as Committee for the Simplification and Standardisation of the Design and Configuration of Waterfront Structures.