abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small
Beton-Kalender 2014

Bergmeister, Konrad / Fingerloos, Frank / Wörner, Johann-Dietrich (eds.)

Beton-Kalender 2014

Schwerpunkte: Unterirdisches Bauen - Grundbau - Eurocode 7

November 2013
  • 1334 pages
  • 814 figures
  • 285 tables
  • Hardcover
  • German
ISBN: 978-3-433-03051-6

Save 50% now!

out of print
 

About the book

Underground construction and foundations are very complex and expensive today, particularly in inner cities. In order to provide a quick overview of the interfaces and the necessary dialogue among qualified engineers in modern design and construction, the entire range of disciplines and specialisations involved are described.

The latest types of foundations and construction methods in general building are extensively described. Particular attention is paid to the highly non-linear and complex holistic behavior of the system ground-structure and the interaction between the verification of serviceability of the foundation and the limit state of load-bearing capacity in the structure above.

Excavations are required for almost all construction projects, from pipe laying to extensive building projects between existing buildings. The essential calculation methods and construction processes are explained here, updated from EAB 2012.