abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small
03. May 2016

Geomechanics and Tunnelling 02/16

Cover_Geomechanics and Tunnelling_2016_02

Cover Story:

The tunnel drives in the section Sedrun had among others to pass the major fault zone of the Tavetsch Intermediate Massif. In order to cope with the expected high radial deformation special equipment and yielding support elements were used. The overlapping TH-profiles were mounted to a ring using a 54 t support machine.

Table of Contents:

Gotthard Base Tunnel

  • Choice of the tunnel system
  • Technical project overview
  • Tunnel drives at Sedrun
  • Ground conditions in Faido
  • Management of tunnel spoil
  • Environmental monitoring
  • Performance indicator of linings

Order a free sample copy of Geomechanics and Tunnelling.