02. December 2020
Journal Geomechanics and Tunnelling 6/2020 published
Cover picture:
The 25 km long Thames Tideway Tunnel, with an internal diameter of 7.2 m, is a large wastewater interceptor and storage tunnel designed to prevent several million cubic metres of untreated wastewater from spilling into the Thames each year. Access to the tunnel, which is driven at depths of between 30 and 60 metres, is via deep shafts and access tunnels. For the access shaft on the Victoria Embankment construction site, the AT – Pipe Umbrella System with innovative squeezed connection was used to secure an access tunnel at the base of the shaft (see page 665). (Photo: DSI Underground)
Table of Contents Journal Geomechanics and Tunnelling 6/2020
- Geotechnically relevant hazards
- International large projects
Recommendations
- Winter, Stefan / Peter, Mandy (eds.)
Holzbau-TaschenbuchGrundlagen
10. Edition – August 2021- XIV, 546 pages
- Hardcover
- German
ISBN: 978-3-433-01805-7available- €99,00
- de Borst, René / Crisfield, Mike A. / Remmers, Joris J. C. / Verhoosel, Clemens V.
Nichtlineare Finite-Elemente-Analyse von Festkörpern und Strukturen
October 2014- 587 pages
- Softcover
- German
ISBN: 978-3-527-33660-9out of print - more