abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small
28. February 2022

Journal Geomechanics and Tunnelling 1/22 published

Cover picture:

geot_0122The 27 km long second track between Divača and Koper is one of Slovenia’s most important infrastructure projects and includes eight tunnels with a total length of approx. 20.5 km. For tunnel T8, starting form Koper to the North, DSI Underground supplies all ground support equipment. (photo: DSI Underground)

Table of Contents Journal Geomechanics and Tunnelling 1/2022

  • Reservoir characterisation in the South German Molasse Basin
  • Rock mass as key element for to the utilization of geothermal energy
  • 3D THM simulation of a fractured petrothermal reservoir
  • Geothermal reservoir reaction during proppant emplacement
  • Water jet drilling technology for application in geothermal environments
  • Utilization of tunnel and mines for geothermal puropose