abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small
11. August 2022

Journal Geomechanics and Tunnelling 04/22 published

Cover picture:

geot_0422To increase overall safety, standardize Croatia’s highway network, and adapt to the increased traffic to and from European countries, the Croatian Government decided to build a second tube for the Učka Tunnel – the third-longest tunnel in Croatia. DSI Underground produced and supplied anchor systems and equipment to support excavation. (photo: DSI underground)

Table of Contents Journal Geomechanics and Tunnelling 4/2022

  • Tunnelling information management system
  • Data drops for tunnel information modelling
  • BIM model for the tunnel tender and excavation phase
  • Prerequisites for BIM-based invoicing in NATM projects
  • Current developments of digital ground modelling in tunnelling
  • High-resolution multi-purpose tunnel surface 3D rendering
  • Automation and digitalisation of the geological documentation
  • Rapid data integration and visualisation
  • Efficient digitization of the Zentrum am Berg research tunnel