abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small
12. February 2023

Journal Geomechanics and Tunneling 01/23 published

Coverpicture

The 27 km long second track between Divaca and Koper is one of Slovenia’s most important infrastructure projects and includes seven tunnels with a total length of approx. 20.5 km. For tunnel T7 – Mlinarji above the Ospska valley in Cˇ rni Kal, DSI Underground supplies all ground support equipment.

(photo: DSI Underground)

Table of Contents Journal Geomechanics and Tunneling 01/23

  • Analysis of TBM performance and TBM parameters
  • Analyses of pre-excavation grouting for TBM tunnelling
  • Soft sedimentary rocks and their boreability characteristics
  • 3D-nonlinear FE analysis of staged shield driven tunnel excavation
  • Lessons from tunnelling through glacial open gravel deposits
  • EPB tunnelling in long highly sensitive sections
  • Geotechnical design of underground structures with TBM excavation
  • Innovative contract and compensation model

Newsletter