abo_giftabo_onlineabo_printabo_studentabo_testangle_leftangle_rightangle_right_filledarrow_big_downarrow_big_down_filledarrow_big_leftarrow_big_left_filledarrow_big_rightarrow_big_right_filledarrow_big_uparrow_big_up_filledarrow_dropdown_downarrow_dropdown_uparrow_small_leftarrow_small_left_filledarrow_small_rightarrow_small_right_filledarrow_stage_leftarrow_stage_left_filledarrow_stage_rightarrow_stage_right_filledcaret_downcaret_upcloseclose_thinclose_thin_filledcontactdownload_thickdownload_thick_filleddownload_thindownload_thin_filledebookeditelement_headlineelement_labelelement_relatedcontentlockmailminuspagepage_filledpagespages_filledphoneplusprintprint_filledquotationmarks_leftquotationmarks_rightsearchsendshareshare_filledshoppingcart_bigshoppingcart_big_filledshoppingcart_headershoppingcart_smallshoppingcart_small_filledsocial_facebooksocial_linkedinsocial_pinterest social_xsocial_xingsocial_youtubesocial_twitteruser_biguser_small
19. June 2018

Geomechanics & Tunnelling 03/2018

Geomechanics and Tunnelling

For the extension of the Metro T Third Line in San Francisco, 2.7 km of tunnels and four new stations will be built. At the Chinatown Station, a cross-cut cavern was excavated by the side drift method. A 27 m long AT–139 pipe umbrella was used to secure the crosscut and the two side drifts. (Photo: DSI Underground)

  • 25 years research and development at Graz University of Technology
  • Short-term prediction of shotcrete utilization 
  • Hybrid methods for shotcrete and segmental linings 
  • Detection of voids in the annular gap using ground penetrating radar 
  • Fibre-optic supported measurement methods for monitoring rock pressure
  • Current research work at Montanuniversitaet Leoben
  • Current research by ÖBB Infrastruktur AG on scale monitoring
  • Storage sites for tunnel excavation material

Interested? If you would like to take a closer look at the journal before subscribing, you can order a free samle copy and we will send it to you.