Autor(en): | Gibson, Nick D. |
Titel: | How to get a membrane structure off the drawing board |
Kurzfassung: | This paper highlights the processes that are required to take a membrane structure from the design stage to final fabrication. Those processes involve determining the final geometry, developing an approved seam layout, undertaking material tests to determine stretch characteristics and issuing a final set of fabrication documents. The importance of each step is highlighted and the particular issues as they relate to membrane structures are presented. Particular note is made of the benefit that previous experience in this unique form of construction has in bringing a membrane structure to a successful completion. The paper concludes with a few examples of just what can be achieved when all the final stages of fabrication are carefully followed. |
Erschienen in: | Steel Construction 8 (2015), Heft 4 |
Seite/n: | 244-250 |
Sprache der Veröffentlichung: | Englisch |
Ich möchte den Artikel kaufen
Diesen Artikel können Sie für 25 € als PDF (1.39 MB) erwerben. Das PDF kann gelesen, gedruckt und gespeichert werden. Eine Vervielfältigung und Weiterleitung an Dritte ist nicht gestattet. |
Ich bin Online-AbonnentAls Online-Abonnent der Zeitschrift "Steel Construction" können Sie diesen Artikel über Wiley Online Library aufrufen. |
Ich möchte "Steel Construction" abonnierenDieser Beitrag ist in der Zeitschrift "Steel Construction" erschienen. Sie möchten die Zeitschrift näher kennenlernen? Dann bestellen Sie doch ein kostenloses Probeheft der aktuellen Ausgabe oder informieren sich über Inhalt, Preise und alles Weitere auf unserer Website. |