Author(s): | Kollegger, Johann; Foremniak, Sara; Suza, Dominik; Wimmer, David; Gmainer, Susanne |
Title: | Building bridges using the balanced lift method |
Abstract: | This article explains the process of developing a new method, called the balanced lift method, for constructing bridges based on an alternative to the bridge construction techniques used nowadays. The most common methods of building bridges are those using falsework or the cantilever method, but a rather uncommon method, the lowering of arches is seen as the origin of the balanced lift method. The idea was to create a method that would allow a bridge to be built in a very fast manner without the need for falsework, using prefabricated elements and assembling all parts together in a position - in this case vertically - that would simplify the construction process. In order to reach the final state of the bridge, the parts assembled vertically are rotated into their final horizontal position. This article contains descriptions of the development of the method, a large-scale test and two bridges already designed using the balanced lift method. |
Source: | Structural Concrete 15 (2014), No. 3 |
Page/s: | 281-291 |
Language of Publication: | English |
I would like to buy the article
You can download this article for 25 € as a PDF file (2.31 MB). The PDF file can be read, printed and saved. Duplication and forwarding to third parties is not allowed. |
I am an online subscriberAs an online subscriber of the journal "Structural Concrete" you can access this article via Wiley Online Library. |
I would like to order "Structural Concrete"This article has been published in the journal "Structural Concrete". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website. |