Autor(en): | Kollegger, Johann; Foremniak, Sara; Suza, Dominik; Wimmer, David; Gmainer, Susanne |
Titel: | Building bridges using the balanced lift method |
Kurzfassung: | This article explains the process of developing a new method, called the balanced lift method, for constructing bridges based on an alternative to the bridge construction techniques used nowadays. The most common methods of building bridges are those using falsework or the cantilever method, but a rather uncommon method, the lowering of arches is seen as the origin of the balanced lift method. The idea was to create a method that would allow a bridge to be built in a very fast manner without the need for falsework, using prefabricated elements and assembling all parts together in a position - in this case vertically - that would simplify the construction process. In order to reach the final state of the bridge, the parts assembled vertically are rotated into their final horizontal position. This article contains descriptions of the development of the method, a large-scale test and two bridges already designed using the balanced lift method. |
Erschienen in: | Structural Concrete 15 (2014), Heft 3 |
Seite/n: | 281-291 |
Sprache der Veröffentlichung: | Englisch |
Ich möchte den Artikel kaufen
Diesen Artikel können Sie für 25 € als PDF (2.31 MB) erwerben. Das PDF kann gelesen, gedruckt und gespeichert werden. Eine Vervielfältigung und Weiterleitung an Dritte ist nicht gestattet. |
Ich bin Online-AbonnentAls Online-Abonnent der Zeitschrift "Structural Concrete" können Sie diesen Artikel über Wiley Online Library aufrufen. |
Ich möchte "Structural Concrete" abonnierenDieser Beitrag ist in der Zeitschrift "Structural Concrete" erschienen. Sie möchten die Zeitschrift näher kennenlernen? Dann bestellen Sie doch ein kostenloses Probeheft der aktuellen Ausgabe oder informieren sich über Inhalt, Preise und alles Weitere auf unserer Website. |