Author(s): | Barbanti, Marco; Bonanno, Marco; Rigazio, Andrea |
Title: | Consolidation grouting using horizontal directional drilling technology in the Praga district of Warsaw prior to TBM tunnelling |
Abstract: | The central section of the Warsaw 2nd Metro Line required preventive measures to protect buildings located in the Praga district above the tunnel alignment. The sections passing below buildings with EPB machines were certainly one of the most critical points. It was decided to carry out ground treatment in order to consolidate the subsoil around the tunnels. For this purpose grouting holes up to 261 m long were drilled by HDD following the tunnel path. Tunnelling did not affect the structures located above the ground, which always remained under close supervision with the use of specialist and multithreaded monitoring. |
Source: | Geomechanics and Tunnelling 7 (2014), No. 3 |
Page/s: | 248-254 |
Language of Publication: | English/German |
I would like to buy the article
You can download this article for 25 € as a PDF file (2.9 MB). The PDF file can be read, printed and saved. Duplication and forwarding to third parties is not allowed. |
I am an online subscriberAs an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library. |
I would like to order "Geomechanics and Tunnelling"This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website. |