Autor(en): | Barbanti, Marco; Bonanno, Marco; Rigazio, Andrea |
Titel: | Consolidation grouting using horizontal directional drilling technology in the Praga district of Warsaw prior to TBM tunnelling |
Kurzfassung: | The central section of the Warsaw 2nd Metro Line required preventive measures to protect buildings located in the Praga district above the tunnel alignment. The sections passing below buildings with EPB machines were certainly one of the most critical points. It was decided to carry out ground treatment in order to consolidate the subsoil around the tunnels. For this purpose grouting holes up to 261 m long were drilled by HDD following the tunnel path. Tunnelling did not affect the structures located above the ground, which always remained under close supervision with the use of specialist and multithreaded monitoring. |
Erschienen in: | Geomechanics and Tunnelling 7 (2014), Heft 3 |
Seite/n: | 248-254 |
Sprache der Veröffentlichung: | Englisch/Deutsch |
Ich möchte den Artikel kaufen
Diesen Artikel können Sie für 25 € als PDF (2.9 MB) erwerben. Das PDF kann gelesen, gedruckt und gespeichert werden. Eine Vervielfältigung und Weiterleitung an Dritte ist nicht gestattet. |
Ich bin Online-AbonnentAls Online-Abonnent der Zeitschrift "Geomechanics and Tunnelling" können Sie diesen Artikel über Wiley Online Library aufrufen. |
Ich möchte "Geomechanics and Tunnelling" abonnierenDieser Beitrag ist in der Zeitschrift "Geomechanics and Tunnelling" erschienen. Sie möchten die Zeitschrift näher kennenlernen? Dann bestellen Sie doch ein kostenloses Probeheft der aktuellen Ausgabe oder informieren sich über Inhalt, Preise und alles Weitere auf unserer Website. |