Autor(en): | Maidl, Ulrich; Pierri, Julio C. D. D. |
Titel: | Innovative hybrid EPB tunnelling in Rio de Janeiro |
Kurzfassung: | The Line 4 South being constructed in Rio de Janeiro crosses complex geology that includes a long stretch of sand bounded by two stretches of hard, highly abrasive rock. These geological conditions, combined with the fact that the project is located in a distinct urban area, creates a demanding project scenario where special care needs to be taken. After carrying out an evaluation to determine whether to use earth pressure balance or slurry technology, the design of a convertible EPB boring machine that can excavate both rock and soils was developed. This paper outlines the technical difficulties of the project and describes the decision-making process and the solutions adopted. A technical description of the different operation modes of this hybrid TBM and the conditioning process related to each of them is provided. |
Erschienen in: | Geomechanics and Tunnelling 7 (2014), Heft 1 |
Seite/n: | 55-63 |
Sprache der Veröffentlichung: | Englisch/Deutsch |
Ich möchte den Artikel kaufen
Diesen Artikel können Sie für 25 € als PDF (1.93 MB) erwerben. Das PDF kann gelesen, gedruckt und gespeichert werden. Eine Vervielfältigung und Weiterleitung an Dritte ist nicht gestattet. |
Ich bin Online-AbonnentAls Online-Abonnent der Zeitschrift "Geomechanics and Tunnelling" können Sie diesen Artikel über Wiley Online Library aufrufen. |
Ich möchte "Geomechanics and Tunnelling" abonnierenDieser Beitrag ist in der Zeitschrift "Geomechanics and Tunnelling" erschienen. Sie möchten die Zeitschrift näher kennenlernen? Dann bestellen Sie doch ein kostenloses Probeheft der aktuellen Ausgabe oder informieren sich über Inhalt, Preise und alles Weitere auf unserer Website. |