Author(s): | |
Title: | Tiefe Baugrube in Teildeckelbauweise am Alsterufer in Hamburg |
Abstract: | Direkt an der Hamburger Außenalster wurde für die Errichtung hochwertiger Büro- und Gewerbeflächen mit vier Untergeschossen eine ca. 13 m tiefe Trogbaugrube in Schlitzwandbauweise und mit natürlicher Dichtsohle erforderlich. Aufgrund von sensibler Nachbarbebauung waren nur geringe Baugrundverformungen verträglich. Dies konnte mittels einer innen liegenden Aussteifung als vorgespanntes Stahlfachwerk in der oberen Steifungslage und einem Stahlbetonteildeckel in der unteren Steifungslage sichergestellt werden. Im Rahmen eines umfangreichen Messprogramms wurden die im Entwurf berechneten Baugrundverformungen bestätigt. Deep excavation pit with partial concrete cover at Alsterufer in Hamburg Along with the development of an exclusive office- and business building with four underground parking levels an about 13 m deep excavation pit with diaphragm walls and natural bottom sealing was needed. Considering the sensitive neighbouring buildings only little deformation of the underground was acceptable. By using a pre-stressed inner framework as upper bracing and a partial concrete cover as lower bracing the requirements were fulfilled. Already during preliminary design calculated ground deformations could be approved by an extensive measuring program accompanying the project. |
Source: | Bautechnik 90 (2013), No. 11 |
Page/s: | 753-758 |
Language of Publication: | German |
I would like to buy the article
You can download this article for 25 € as a PDF file (2.97 MB). The PDF file can be read, printed and saved. Duplication and forwarding to third parties is not allowed. |
I am an online subscriberAs an online subscriber of the journal "Bautechnik" you can access this article via Wiley Online Library. |
I would like to order "Bautechnik"This article has been published in the journal "Bautechnik". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website. |