Logo Ernst und Sohn

Preview

Author(s):     
 
Barla, Marco; Barla, Giovanni; Gianoglio, Gianluca
 
Title:     
 

 
Abstract:     
 
The excavation of a 3.6 km long tunnel for the Torino Metro Line 1 South Extension was recently completed by a 7.8 m diameter EPB TBM. A critical section of the tunnel was near Corso Spezia, in the Lingotto area, where the main difficulties were the presence of the water table and the poor ground conditions encountered. Another concern was the effect of the excavation on two five-storey masonry buildings adjacent to the tunnel alignment, which were constructed in 1930 and suffered severe damage during World War II. Continuous monitoring was undertaken during excavation as time dependent settlements occurred. 2D Finite Element modelling was used to simulate the excavation and its effects on the buildings. This paper describes the most significant performance monitoring data, which is compared with the results of modelling.
Kürzlich wurde der Vortrieb eines 3,6 km langen Tunnels für die Süderweiterung der Turiner Metro Linie 1 mittels einer EPB-Tunnelbohrmaschine mit einem Durchmesser von 7,8 m abgeschlossen. Ein kritischer Abschnitt des Tunnels lag nahe dem Corso Spezia, im Lingotto Bereich. Die Hauptschwierigkeiten dort waren die Lage des Grundwasserspiegels und die schlechten angetroffenen Bodenverhältnissen. Eine weitere Sorge galt den Auswirkungen des Tunnelvortriebs auf zwei nahe der Tunneltrasse gelegene, fünfstöckige Mauerwerksgebäude, die in den 1930er Jahren erbaut wurden und bereits im zweiten Weltkrieg erhebliche Schäden erlitten hatten. Während des Vortriebs wurde daher eine kontinuierliche Überwachung der auftretenden zeitabhängigen Setzungen durchgeführt. Eine 2D Finite-Elemente Modellierung diente der Simulation des Vortriebsvorgangs und dessen Auswirkungen auf die Gebäude. Im vorliegenden Beitrag werden die wichtigsten Daten des Monitorings dargestellt und mit den Modellierungsergebnissen verglichen.
 
Source:     Geomechanics and Tunnelling 5 (2012), No. 3
 
Page/s:     233-242
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (2.25 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


To enquire about the cost of the contribution and to order the PDF, please send us an e-mail to marketing@ernst-und-sohn.de. You can also use the following button.

make a request

I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.