New pumped storage station to cover peaks of electricity demand / Neues Pumpspeicherwerk zur Abdeckung des Bedarfs an Spitzenenergie
 
Abstract:     
 
The Kraftwerke Linth-Limmern AG, an important Swiss high-pressure power company, is extending its existing plant with the Linthal 2015 project in order to continue to be able to guarantee a secure electricity supply. The core element of the project is the Limmern pumped storage station with pumping and generation power of 1,000 MW each. Construction work on the project started at the end of September 2009. The construction sites high in the mountains, which extend up to a height of 2, 500 m above sea level, are accessed by two 25 t construction cable railways. Not only the logistics, weather and natural hazards but also the sheer size of the project are a great challenge for all parties. The total construction period for the Limmern pumped storage station is estimated at seven years, and commissioning of the four machine groups is planned for 2015/16.
Die Kraftwerke Linth-Limmern AG, ein bedeutendes Schweizer Hochdruckkraftwerk, baut mit dem Projekt Linthal 2015 ihre bestehenden Anlagen aus, um auch in Zukunft eine sichere Stromversorgung gewährleisten zu können. Kernstück des Projekts bildet das Pumpspeicherwerk Limmern mit einer Pump- und Turbinenleistung von je 1.000 MW. Der Baubeginn des Projekts erfolgte Ende September 2009. Die Hochgebirgsbaustellen, die bis in eine Höhe von 2.500 m ü.M. reichen, werden durch zwei 25-t-Bauseilbahnen erschlossen. Die Logistik, die Witterung und die Naturgefahren sowie die Größe des Projekts stellen große Anforderungen an alle Beteiligten. Insgesamt wird für das PSW Limmern mit einer Bauzeit von knapp sieben Jahren gerechnet. Die Inbetriebnahme der vier Maschinengruppen ist in den Jahren 2015/16 vorgesehen.
 
Source:     Geomechanics and Tunnelling 4 (2011), No. 6
 
Page/s:     643-650
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (1.02 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


To enquire about the cost of the contribution and to order the PDF, please send us an e-mail to marketing@ernst-und-sohn.de. You can also use the following button.

make a request

I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.