Logo Ernst und Sohn

Preview

Author(s):     
 

 
Title:     
 

 
Abstract:     
 
The main part of the bridge is a basket handle type tied-arch bridge. The geometrical size, structural solutions and erection method of the bridge required preliminary research and advanced design methodology. This paper gives a general outline about the construction of the steel structure of the arch bridge and emphasizes some of the design aspects.
 
Source:     Steel Construction 4 (2011), No. 3
 
Page/s:     150-160
 
Language of Publication:     English



I would like to buy the article

You can download this article for 25 € as a PDF file (1.26 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


To enquire about the cost of the contribution and to order the PDF, please send us an e-mail to marketing@ernst-und-sohn.de. You can also use the following button.

make a request

I am an online subscriber

As an online subscriber of the journal "Steel Construction" you can access this article via Wiley Online Library.

I would like to order "Steel Construction"

This article has been published in the journal "Steel Construction". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.