Logo Ernst und Sohn

Preview

Author(s):     
 
Fink, Josef; Aigner, Francesco
 
Title:     
 

 
Abstract:     
 
At the very end of the 1890s, the rural district of Urfahr was connected to the town of Linz, Austria, by means of a seven-span, 393.94 m long steel bridge. Serious problems regarding its durability arose from the use of the bridge for road traffic due to the application of de-icing salt, which began in the mid-1960s and caused severe corrosion damage. In 1981 the bridge was improved by restoring the anti-corrosion protection and by replacing the old deck construction with a new one. Since that time, restoration works and repairs have been carried out continuously. This paper deals with the present reliability of the main spans with a special focus on the structural behaviour under traffic and wind loads, quantified by means of modern standards.
 
Source:     Steel Construction 4 (2011), No. 1
 
Page/s:     13-20
 
Language of Publication:     English



I would like to buy the article

You can download this article for 25 € as a PDF file (0.66 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


To enquire about the cost of the contribution and to order the PDF, please send us an e-mail to marketing@ernst-und-sohn.de. You can also use the following button.

make a request

I am an online subscriber

As an online subscriber of the journal "Steel Construction" you can access this article via Wiley Online Library.

I would like to order "Steel Construction"

This article has been published in the journal "Steel Construction". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.