Author(s): | Fink, Josef; Aigner, Francesco |
Title: | |
Abstract: | At the very end of the 1890s, the rural district of Urfahr was connected to the town of Linz, Austria, by means of a seven-span, 393.94 m long steel bridge. Serious problems regarding its durability arose from the use of the bridge for road traffic due to the application of de-icing salt, which began in the mid-1960s and caused severe corrosion damage. In 1981 the bridge was improved by restoring the anti-corrosion protection and by replacing the old deck construction with a new one. Since that time, restoration works and repairs have been carried out continuously. This paper deals with the present reliability of the main spans with a special focus on the structural behaviour under traffic and wind loads, quantified by means of modern standards. |
Source: | Steel Construction 4 (2011), No. 1 |
Page/s: | 13-20 |
Language of Publication: | English |
I would like to buy the article
You can download this article for 25 € as a PDF file (0.66 MB). The PDF file can be read, printed and saved. Duplication and forwarding to third parties is not allowed. |
I am an online subscriberAs an online subscriber of the journal "Steel Construction" you can access this article via Wiley Online Library. |
I would like to order "Steel Construction"This article has been published in the journal "Steel Construction". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website. |