Autor(en): | |
Titel: | Structural steelwork for Strizkov underground station, Prague |
Kurzfassung: | A new underground station at Střížkov in Prague has been designed and built as a special structure with a high level of aesthetics. The hall structure is 160 m long, 42 m wide and 20 m high. Two crossing hingeless main arches spanning 160 m are fixed to concrete pylons. The roof structure is suspended from the main arches using a system of prestressed rods and supported by columns around the roof. Most of the members are curved with variable cross-sections (the majority of sections are welded boxes with a plate thickness of 10 - 35 mm except the columns, which are welded I-sections). The geometry of all parts made design, fabrication and erection very difficult. The whole structure was built under the direct supervision of the architect. The underground station was opened to the public in May 2008. |
Erschienen in: | Steel Construction 3 (2010), Heft 2 |
Seite/n: | 63-68 |
Sprache der Veröffentlichung: | Deutsch |
Ich möchte den Artikel kaufen
Diesen Artikel können Sie für 25 € als PDF (0.62 MB) erwerben. Das PDF kann gelesen, gedruckt und gespeichert werden. Eine Vervielfältigung und Weiterleitung an Dritte ist nicht gestattet. |
Ich bin Online-AbonnentAls Online-Abonnent der Zeitschrift "Steel Construction" können Sie diesen Artikel über Wiley Online Library aufrufen. |
Ich möchte "Steel Construction" abonnierenDieser Beitrag ist in der Zeitschrift "Steel Construction" erschienen. Sie möchten die Zeitschrift näher kennenlernen? Dann bestellen Sie doch ein kostenloses Probeheft der aktuellen Ausgabe oder informieren sich über Inhalt, Preise und alles Weitere auf unserer Website. |