Logo Ernst und Sohn

Preview

Author(s):     
 
Lieb, R. H.
 
Title:     
 

 
Abstract:     
 
The management of the handling of approximately 25 m tonnes of spoil material from the Gotthard Base Tunnel was and still is an enormous challenge. A permit system for concrete mixes and continuous testing of the excavated raw material and the grading of the broken rock ensure that as much spoil material as possible can be reused for the production of high-quality concretes and shotcretes for the construction of the tunnel.
Although a generous margin has been applied to forecasts in materials management since the start of the project, extensive alterations were necessary to the plans and facilities for materials management to deal with the actual development of the project. The main reasons for this were changes to the schedule of material production and requirements and changes of material quantities within and between the individual sections. It has proved possible so far to avoid materials management becoming a factor holding back the performance.

Die Bewirtschaftung der rund 25 Mio. Tonnen Ausbruchmaterial des Gotthard-Basistunnels war und ist eine enorme Herausforderung. Ein Zulassungssystem für Betonrezepturen sowie laufende Prüfungen am ausgebrochenen Rohmaterial und den aufbereiteten Gesteinskörnungen stellen sicher, dass möglichst viel Ausbruchmaterial wiederverwertet wird und damit hochwertige Betone und Spritzbetone für den Tunnelbau hergestellt werden. Obwohl seit Projektbeginn in der Materialbewirtschaftung mit großzügigen Prognosebandbreiten gearbeitet wurde, waren aufgrund der tatsächlichen Projektentwicklung umfangreiche Anpassungen an den Konzepten und Anlagen der Materialbewirtschaftung erforderlich. Die Hauptgründe dafür sind zeitliche Verschiebungen von Materialanfall und -bedarf sowie Veränderungen der Materialmengen innerhalb und zwischen den einzelnen Teilabschnitten. Bisher ist es gelungen die Materialbewirtschaftung nicht zum leistungsbestimmenden Faktor werden zu lassen.
 
Source:     Geomechanics and Tunnelling 2 (2009), No. 5
 
Page/s:     619-626
 
Language of Publication:     English/German



I would like to buy the article

You can download this article for 25 € as a PDF file (1.04 MB).
The PDF file can be read, printed and saved.
Duplication and forwarding to third parties is not allowed.


To enquire about the cost of the contribution and to order the PDF, please send us an e-mail to marketing@ernst-und-sohn.de. You can also use the following button.

make a request

I am an online subscriber

As an online subscriber of the journal "Geomechanics and Tunnelling" you can access this article via Wiley Online Library.

I would like to order "Geomechanics and Tunnelling"

This article has been published in the journal "Geomechanics and Tunnelling". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website.


Prices include VAT and postage. Prices for 2017/2018.
€ Prices apply to Germany only. Subject to alterations, errors excepted.