Author(s): | Akkermann, J.; Runte, T.; Krebs, D. |
Title: | Ship lift at Three Gorges Dam, China - design of steel structures |
Abstract: | The vertical ship lift at the Three Gorges Dam in China will consist of a reinforced concrete structure with an internal steel ship chamber. The chamber will be a self-supporting orthotropic plate structure, continuously suspended from ropes with counterweights. Its components, such as segment gates, drive, horizontal guiding systems in the longitudinal and transverse directions plus locking and safety mechanisms are described here. A special procedure for reducing the tolerances of the steel components embedded in the reinforced concrete structure is explained. |
Source: | Steel Construction 2 (2009), No. 2 |
Page/s: | 61-71 |
Language of Publication: | English |
I would like to buy the article
You can download this article for 25 € as a PDF file (1.23 MB). The PDF file can be read, printed and saved. Duplication and forwarding to third parties is not allowed. |
I am an online subscriberAs an online subscriber of the journal "Steel Construction" you can access this article via Wiley Online Library. |
I would like to order "Steel Construction"This article has been published in the journal "Steel Construction". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website. |