Author(s): | |
Title: | Spanning the River Rhine with a new cable-stayed bridge |
Abstract: | This paper reports on the design and construction of the new bridge over the River Rhine being built near the cities of Wesel and Büderich, Germany, the “Niederrheinbrücke”. The paper outlines the design and bidding process as well as the construction of the new bridge, which will be the longest cable-stayed bridge in Germany. The new Rhine crossing is only the second cable-stayed bridge in Germany to use parallel strands (Suspa DSI) rather than steel wire ropes (locked coil ropes) and contributes to a new generation of cable-stayed bridges in Germany. |
Source: | Steel Construction 2 (2009), No. 1 |
Page/s: | 9-14 |
Language of Publication: | English |
I would like to buy the article
You can download this article for 25 € as a PDF file (0.48 MB). The PDF file can be read, printed and saved. Duplication and forwarding to third parties is not allowed. |
I am an online subscriberAs an online subscriber of the journal "Steel Construction" you can access this article via Wiley Online Library. |
I would like to order "Steel Construction"This article has been published in the journal "Steel Construction". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website. |