Titel: | Technical Challenges During Construction of Alborz Service Tunnel, Iran |
Kurzfassung: | The Tehran Shomal Motorway project is one the major infrastructure projects currently ongoing in Iran. The line will connect the capital of Iran, Tehran with the Caspian Sea. The traffic volume is very high and the conditions of the actual roads, especially in the winter and holiday times are dangerous. The Alborz tunnel system, with the actual ongoing excavation of its service tunnel, is the outstanding lot of the Tehran Shomal Motorway project. The project is facing severe and adverse geological conditions like various dangerous gases, water and material inrush and blocked TBM. Depending on the conditions at the remaining length the breakthrough is anticipated by early 2009. |
Erschienen in: | Geomechanics and Tunnelling 1 (2008), Heft 6 |
Seite/n: | 537-542 |
Sprache der Veröffentlichung: | Deutsch |
Ich möchte den Artikel kaufen
Diesen Artikel können Sie für 25 € als PDF (1.73 MB) erwerben. Das PDF kann gelesen, gedruckt und gespeichert werden. Eine Vervielfältigung und Weiterleitung an Dritte ist nicht gestattet. |
Ich bin Online-AbonnentAls Online-Abonnent der Zeitschrift "Geomechanics and Tunnelling" können Sie diesen Artikel über Wiley Online Library aufrufen. |
Ich möchte "Geomechanics and Tunnelling" abonnierenDieser Beitrag ist in der Zeitschrift "Geomechanics and Tunnelling" erschienen. Sie möchten die Zeitschrift näher kennenlernen? Dann bestellen Sie doch ein kostenloses Probeheft der aktuellen Ausgabe oder informieren sich über Inhalt, Preise und alles Weitere auf unserer Website. |