Author(s): | |
Title: | Improved Design Method for Pre-stressed Water Tunnels |
Abstract: | The final design of the pumped-storage project Feldsee features a complex lining and pre-stress grouting concept, rendering the method presented by Seeber insufficient for an accurate determination of the system behaviour in all stages of construction and operation. A calculation procedure based on the matrix stiffness method has been implemented, allowing incorporation of multistage pre-stressing injections at different locations of a lining being composed of several layers with different mechanical properties. Based on the design obtained by applying the above method, another question of maximum allowable non-symmetric displacement of the pre-cast concrete segment arose. A parametric study has been used to determine the boundaries of asymmetric displacements throughout the pre-stressing procedure, allowing establishment of threshold values for the monitoring conducted during the pre-stressing injections. |
Source: | Geomechanik und Tunnelbau 1 (2008), No. 5 |
Page/s: | 383-389 |
Language of Publication: | German |
I would like to buy the article
You can download this article for 25 € as a PDF file (0.78 MB). The PDF file can be read, printed and saved. Duplication and forwarding to third parties is not allowed. |
I am an online subscriberAs an online subscriber of the journal "Geomechanik und Tunnelbau" you can access this article via Wiley Online Library. |
I would like to order "Geomechanik und Tunnelbau"This article has been published in the journal "Geomechanik und Tunnelbau". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website. |