Autor(en): | |
Titel: | Improved Design Method for Pre-stressed Water Tunnels |
Kurzfassung: | The final design of the pumped-storage project Feldsee features a complex lining and pre-stress grouting concept, rendering the method presented by Seeber insufficient for an accurate determination of the system behaviour in all stages of construction and operation. A calculation procedure based on the matrix stiffness method has been implemented, allowing incorporation of multistage pre-stressing injections at different locations of a lining being composed of several layers with different mechanical properties. Based on the design obtained by applying the above method, another question of maximum allowable non-symmetric displacement of the pre-cast concrete segment arose. A parametric study has been used to determine the boundaries of asymmetric displacements throughout the pre-stressing procedure, allowing establishment of threshold values for the monitoring conducted during the pre-stressing injections. |
Erschienen in: | Geomechanik und Tunnelbau 1 (2008), Heft 5 |
Seite/n: | 383-389 |
Sprache der Veröffentlichung: | Deutsch |
Ich möchte den Artikel kaufen
Diesen Artikel können Sie für 25 € als PDF (0.78 MB) erwerben. Das PDF kann gelesen, gedruckt und gespeichert werden. Eine Vervielfältigung und Weiterleitung an Dritte ist nicht gestattet. |
Ich bin Online-AbonnentAls Online-Abonnent der Zeitschrift "Geomechanik und Tunnelbau" können Sie diesen Artikel über Wiley Online Library aufrufen. |
Ich möchte "Geomechanik und Tunnelbau" abonnierenDieser Beitrag ist in der Zeitschrift "Geomechanik und Tunnelbau" erschienen. Sie möchten die Zeitschrift näher kennenlernen? Dann bestellen Sie doch ein kostenloses Probeheft der aktuellen Ausgabe oder informieren sich über Inhalt, Preise und alles Weitere auf unserer Website. |