Author(s): | Pichler, P.; Fleischhacker, E. |
Title: | Handling of Excavated Material from the Koralm Tunnel in Styria |
Abstract: | The Koralm Railway Line represents an essential section of the Pontebbana corridor between Graz and Klagenfurt. It creates new capacities and significantly improved conditions for the freight transportation. Furthermore, the travel time of the passenger traffic will be considerably reduced. The heart of the Koralm railway Line is the Koralm tunnel with a length of approximately 32.8 km. Right from the first steps of planning it became clear that there would be a demand for an economical and ecological handling of the excavated materials. So a specific programme was performed, which is presented in this paper. The experiences made will strongly influence the programme of construction and the detailed design of the future main tunnel structure. |
Source: | Geomechanik und Tunnelbau 1 (2008), No. 4 |
Page/s: | 300-302 |
Language of Publication: | German |
I would like to buy the article
You can download this article for 25 € as a PDF file (0.62 MB). The PDF file can be read, printed and saved. Duplication and forwarding to third parties is not allowed. |
I am an online subscriberAs an online subscriber of the journal "Geomechanik und Tunnelbau" you can access this article via Wiley Online Library. |
I would like to order "Geomechanik und Tunnelbau"This article has been published in the journal "Geomechanik und Tunnelbau". If you would like to learn more about the journal, you can order a free sample copy or find out more information on our website. |