Autor(en): | Eder, A.; Kienast, G.; Rinner, H. |
Titel: | Basic Surveying of the Koralm Tunnel |
Kurzfassung: | The “Koralm tunnel basic network” had to be prepared for the design, construction, and construction supervision of the ÖBB railway project “Koralmbahn Graz-Klagenfurt” with the 32.8 km long Koralm tunnel as its core piece. This network is based on the “primary network” which is integrated into a network of GPS permanent stations and was or will be complemented as required. Since the project area covers two meridian zones of the national system, it was necessary to create a projection in a separate meridian zone for planar calculations. The paper describes the preparation, surveying and calculation of this network. In addition, it includes procedure instructions for the use of the network by planners and construction companies. Since the network has to be adapted to each construction phase, it has to be continuously developed. This will be described too. All data are managed by means of an ArcGIS server. |
Erschienen in: | Geomechanik und Tunnelbau 1 (2008), Heft 4 |
Seite/n: | 294-299 |
Sprache der Veröffentlichung: | Deutsch |
Ich möchte den Artikel kaufen
Diesen Artikel können Sie für 25 € als PDF (1.16 MB) erwerben. Das PDF kann gelesen, gedruckt und gespeichert werden. Eine Vervielfältigung und Weiterleitung an Dritte ist nicht gestattet. |
Ich bin Online-AbonnentAls Online-Abonnent der Zeitschrift "Geomechanik und Tunnelbau" können Sie diesen Artikel über Wiley Online Library aufrufen. |
Ich möchte "Geomechanik und Tunnelbau" abonnierenDieser Beitrag ist in der Zeitschrift "Geomechanik und Tunnelbau" erschienen. Sie möchten die Zeitschrift näher kennenlernen? Dann bestellen Sie doch ein kostenloses Probeheft der aktuellen Ausgabe oder informieren sich über Inhalt, Preise und alles Weitere auf unserer Website. |